
S10 Fleet transition
Requirement
To manage the transition to lower environmental impact vehicles by reviewing the composition of the fleet.
Purpose
To understand the opportunities and challenges in the transition to cleaner vehicles to manage future changes and minimise the environmental impact of the fleet
Demonstration
FORS Operators shall conduct a fleet review to understand:
- Projected procurement cycles of vehicles within the fleet
- Estimated total cost of ownership of petrol and diesel internal combustion engine vehicles and their lower environmental impact vehicle alternatives
- Financial support available for the procurement of these vehicles
- Practical considerations for the integration of lower environmental impact vehicles into the fleet, including fuelling and charging requirements, running times, requirement for electricity grid upgrades on charging sites, and any required operational changes
FORS Operators shall document the review findings in the fleet replacement plan to help prepare for any regulatory phase out dates for the procurement of new petrol and diesel vehicles.
FORS Operators may use the fleet replacement plan template to help evidence this requirement.
The fleet review and fleet replacement plan shall be:
- Documented and reviewed in accordance with requirement M1
- Retained in accordance with requirement M2
- Consistent with the vehicle fleet details at requirement M6
The fleet replacement plan can contribute toward requirement S3.
Resources for Silver
Resources marked with a padlock require a FORS account.
Guides
- Common Silver audit mistakes
- Silver audit toolkit (login required)
Training records
- FORS Professional Training Register (login required)
- FORS Training Dashboard (login required)
Tools
- FORS Emissions Calculator (login required)
Templates
- S2 Operational Performance Action Plan (login required)
- S3 Operational Performance Review (login required)
- S6 Vehicle safety equipment report (login required)
- S7 Noise Assessment template (login required)
- S10 Fleet Replacement Plan (login required)
